Northridge Center
Retrofit 95,000
SF within the existing buildings for
the new call center space. The
electrical distribution system was upgraded to handle the new loads and to
improve reliability to some of the critical functions. Two new 330
KVA redundant UPS
system configuration and a new 1,000
KW standby generator.
Ravinia
Center
Retrofit 150,000
SF within the existing building for
the new call center space. The
electrical distribution system, including
existing 600 KW and 1,200 KW standby generator systems were upgraded
to handle the new loads and to improve reliability to some of the critical
functions. New 150
KW and 100 KW UPS systems.
BCE Services: Electrical Design
(Design/Build Project)